[CAMWEST-discuss] prospect to blacktown 24 hour access

Mark Robson Mark.Robson at australwright.com.au
Wed Jul 6 15:58:14 EST 2005


Hi All,


I recently attended the opening of the 'lake' at Pemulway, the new estate just to
the west of Greystanes. The three metre wide shared path alongside the stormwater creek
is well worth a long look, it's so much better than the 2.5 metre paths. The is also a 
3 metre wide bridge.( Nik, article coming for the web site, getting pics on the weekend.)

I took a look at their development model, and this north/south path will indeed join up to Canal at 
it's southern end. Not in a straight line mind you, and gung-ho racers and commuters will probably go
straight up the road, but fully continuous off road shared path there will eventually be all the way from 
Clunies Ross St to the Canal.

Which brings me to my point, 24 hour access from Wetherill Park to Blacktown.

If the Pemulway path is taken Westish to cross the M4 using the existing Clunies Ross St bridge
then a footpath based route could be taken down Blacktown Road and up Aldgate St to the lights
to join up with the Blacktown-Prospect path. 
Also, the existing Girraween Creek path could be joined to Blacktown Road alongside Metalla Rd
and/or through Metalla Reserve.

This would result in the following:

No big long expensive underpass/bridge at the M4/Gt Western Hwy near Fox Hills GC.

Connection of Wetherill Park and Fairfield to Blacktown with a 24 hour route.

Connection of the Prospect Canal to Toongabbie Station, and with McCoy Park built in the future
resulting in connection to the North West Transitway path. My 'Cumberland valley' cycleway
would be complete. ( Nik, article coming for the web site, getting pics on the weekend.)
My dream is to connect the 2 Transitway paths, then continuous path will be available
from Cecil Hills in the south to Rouse Hill and on to Windsor.
  
Only problem:

Aldgate St and Metalla Rd are in such a far flung corner of Blacktown Council that for this short
connection to be completed will need to be pushed by the RTA.

I will of course be taking up the issue with Holroyd Council and will write to my local member
as they have 'announced' fairfield to Blacktown as a viable cycle route in the political advertising.


The Wetherill Park employment area needs to be connected to the Blacktown residential area with a path
that has 24 hour access for commuters. The other route through the reserviour out west to Cowpasture Rd
now has a 24 hour alternative, not as scenic, not as much fun, moer stops at lights, but it's cycle path
all the way. The north/south route through the reserviour lands also needs a bypass open 24 hours. 
Here is the solution!


We need to get this on the agenda at Blacktwon Council, Graeme? At the CSIRO site development meetings
in Holroyd, Blacktown Council argued against a longish underpass on safety grounds, so they should
support this idea.

Where the Pemulway path joins to the Prospect Canal path what will the direction sign say?
I want it to say 'Winston Hills, Blacktown' and mean it!


Mark Robson


This e-mail and any attachments to it are confidential. 

They may contain legally privileged information or copyright material. 

You should not read, copy, use or disclose them without authorisation.

If you are not an intended recipient, please contact us at once by return e-mail. 

We do not accept liability in connection with any computer virus, data corruption, delay, interruption, unauthorised access or
unauthorised amendment.



More information about the CAMWEST-discuss mailing list