<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=iso-8859-1">
<META content="MSHTML 6.00.6000.16414" name=GENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY bgColor=#ffffff>
<DIV><FONT face=Arial size=2>Hi All</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Issues relating to M7 should be treated separately 
as it is a different body who is responsible.</FONT></DIV>
<DIV><FONT face=Arial size=2>Have we got value for money well yes &amp; 
no.&nbsp; Yes we have a great asset and a huge plus for cycling and no for the 
rush to finish the job and the need for many repairs to the payment after only 
18 months would have to be questioned.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Good numbers often seen out riding early Saturday 
mornings.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Rode&nbsp;the whole of the M7 from Richmond Rd to 
Prestons in the Sth on Easter Monday.&nbsp; </FONT></DIV>
<DIV><FONT face=Arial size=2>Landslip area at Dean Park just north of Richmond 
Rd has now been repaired and shared path now open (opened last 
weekend).</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Mowing and some further woodchip landscaping under 
bridges etc is also underway along many sections.&nbsp; Woodchip are dangerous 
as they often get washed onto path and road bikes hate the little slippery 
b%$$ers.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Repairs to surface cracking appears to be an 
ongoing issue and looks like has recently been attended to 'again' albeit the 
fine sand used to take the sticky out of the bitumen is dangerous. </FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Around Rooty Hill Sth near railway overbridge 
potential for landslip with several large gaps in pavement.&nbsp;Area looks like 
it is being closely monitored.</FONT></DIV>
<DIV><FONT face=Arial size=2>Subsidence section near M4 eastbound road exit ramp 
has also been fixed and now open.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Repairs to night lighting continues to be a 
maintenance issue with several sections blacked out.</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Have also recently ridden the section from Norwest 
Boulevard to Quakers Hill (early March) and all was OK then.</FONT></DIV>
<DIV><FONT face=Arial size=2>Not sure of the condition of the intersection of M7 
with Old Windsor Rd near M2.</FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Pathway from M7 along to Sunnyholt Rd and down to 
Kings Park Tavern has lots of glass (RTA issue) </FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Graham Heap</FONT></DIV>
<DIV><FONT face=Arial size=2>Windsor Cyclists</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<BLOCKQUOTE 
style="PADDING-RIGHT: 0px; PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: #000000 2px solid; MARGIN-RIGHT: 0px">
  <DIV style="FONT: 10pt arial">----- Original Message ----- </DIV>
  <DIV 
  style="BACKGROUND: #e4e4e4; FONT: 10pt arial; font-color: black"><B>From:</B> 
  <A title=jonhol2@netscape.net 
  href="mailto:jonhol2@netscape.net">jonhol2@netscape.net</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>To:</B> <A title=camwest-discuss@nicku.org 
  href="mailto:camwest-discuss@nicku.org">camwest-discuss@nicku.org</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>Cc:</B> <A title=aunwin@bicyclensw.org.au 
  href="mailto:aunwin@bicyclensw.org.au">aunwin@bicyclensw.org.au</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>Sent:</B> Tuesday, April 10, 2007 5:09 
  PM</DIV>
  <DIV style="FONT: 10pt arial"><B>Subject:</B> [CAMWEST-discuss] Parramatta 
  T-Way &amp; BNSW</DIV>
  <DIV><BR></DIV>
  <DIV><SPAN contentEditable=false style="DISPLAY: inline-block"></SPAN>Hello 
  everyone,</DIV>
  <DIV>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 
  I spoke with Alex <SPAN class=correction id="">Unwin</SPAN> today about the 
  involvement of <SPAN class=correction id="">BNSW</SPAN> in the <SPAN 
  class=correction id="">Parramatta</SPAN> T-Way problems. Alex has suggested 
  that <SPAN class=correction id="">CamWest</SPAN> put together a submission to 
  <SPAN class=correction id="">BNSW</SPAN> regarding the issue and he will take 
  that to the Minister which will hopefully also raise the issue with the <SPAN 
  class=correction id="">RTA</SPAN>. His <SPAN class=correction 
  id="">sugestion</SPAN> was also that I approach him in this instance as a 
  member of <SPAN class=correction id="">CamWest</SPAN> in the first instance 
  &amp; stating that I am also a Board <SPAN class=correction 
  id="">Memebr</SPAN> of BNSW.</DIV>
  <DIV>&nbsp;</DIV>
  <DIV>Alex suggested that we condense our current discussion <SPAN 
  class=correction id="">emails</SPAN> on this issue and forward them to him, 
  together with the fact that we are trying to meet with <SPAN class=correction 
  id="">Parramatta</SPAN> City Council Traffic <SPAN class=correction 
  id="">Commitee</SPAN> re same.</DIV>
  <DIV>&nbsp;</DIV>
  <DIV>He also suggested some contact with <SPAN class=correction 
  id="">Blacktown</SPAN> City Council re this issue as well. To that end, is 
  anyone aware of problems or incomplete areas of the track beyond <SPAN 
  class=correction id="">Parramatta's</SPAN> jurisdiction that we can document 
  and raise with the Minister's office &amp; <SPAN class=correction 
  id="">RTA</SPAN>?</DIV>
  <DIV>&nbsp;</DIV>
  <DIV>After my ride of a small section of the <SPAN class=correction 
  id="">cycleway</SPAN>, I was amazed at the lack of <SPAN class=correction 
  id="">maintenace</SPAN> &amp; the state of the track already. I was also 
  surprised at the state of the start of &nbsp;<SPAN class=correction 
  id="">M7</SPAN> section &amp; I am led to believe that there has been at least 
  one significant mud slide further along that path. Can some one confirm this 
  please, along with the current state of the <SPAN class=correction 
  id="">M7</SPAN> path?</DIV>
  <DIV>&nbsp;</DIV>
  <DIV>Therefore, could you please forward any additional problems or issues 
  that you may be aware of regarding this costly, yet currently mostly useless 
  piece of infrastructure as soon as possible through the discussion board? I 
  will compile a reply to Alex as soon as I have a sufficient amount of 
  information, possibly by this time next week. I will forward a copy to the 
  discussion before forwarding it to Alex.</DIV>
  <DIV>&nbsp;</DIV>
  <DIV>Thanks</DIV>
  <DIV>&nbsp;</DIV>
  <DIV style="CLEAR: both">John Holstein<BR><BR>"if we don't change direction, 
  we will end up where we are headed"</DIV>
  <DIV class=AOLPromoFooter>
  <HR style="MARGIN-TOP: 10px">
  <A 
  href="http://pr.atwola.com/promoclk/100122638x1081283466x1074645346/aol?redir=http%3A%2F%2Fwww%2Eaim%2Ecom%2Ffun%2Fmail%2F" 
  target=_blank><B>Check Out the new free AIM(R) Mail</B></A> -- 2 GB of storage 
  and industry-leading spam and email virus protection.<BR></DIV>
  <P>
  <HR>

  <P></P>_______________________________________________<BR>CAMWEST-discuss 
  mailing 
  list<BR>CAMWEST-discuss@nicku.org<BR>http://nicku.org/mailman/listinfo/camwest-discuss<BR>CAMWEST 
  web site: http://camwest.pps.com.au/</BLOCKQUOTE></BODY></HTML>